Public Project: Stringtown Road Extended

Description

This project would extend Stringtown Road from its present terminus at Frederick Road (MD 355) to the east side of I-270/Clarksburg Road interchange, a distance of 2,735 feet. The road would be constructed as a four-lane divided roadway with a sidewalk and a shared-use trail. It would have a 120-foot right-of-way. The existing Clarksburg Road (MD 121) connection to the interchange at I-270 would be severed and the road would end in a cul-de-sac just west of the Gateway Center Drive intersection. MD 121 would be accessed from I-270 via Stringtown Road and Gateway Center Drive.

The proposed roadway also includes reconstruction of MD 355 from about 400 feet north of Stringtown Road to a point roughly 650 feet south of the intersection, to add a short southbound left-turn and a turn/acceleration lane along southbound MD 355.

M-NCPPC Staff Contact

Larry Cole
301-495-4528
Larry.Cole@mncppc-mc.org

Applicant

Montgomery County Department of Public Works and Transportation
Staff Contact: Yasamin Esmaili
240-77-7226

Opportunity for Public Participation

Public meetings were held on September 10, 2003 and October 22, 2003 for this project.

Planning Board Review Process & Case Number

Mandatory Referral No. 03806-DPW&T-1.

Planning Board Action

On March 11, 2004, the Planning Board approved the mandatory referral.

Notes from M-NCPPC Staff Contact

None.

 

Date of last page update: March 17, 2006