{"id":5633,"date":"2019-01-16T16:29:28","date_gmt":"2019-01-16T21:29:28","guid":{"rendered":"https:\/\/montgomeryplanning.org\/blog-design\/?p=5633"},"modified":"2019-01-18T09:42:11","modified_gmt":"2019-01-18T14:42:11","slug":"man-made-and-environmental-constraints-on-development-in-montgomery-county","status":"publish","type":"post","link":"https:\/\/montgomeryplanning.org\/blog-design\/2019\/01\/man-made-and-environmental-constraints-on-development-in-montgomery-county\/","title":{"rendered":"Man-made and Environmental Constraints on Development in Montgomery County"},"content":{"rendered":"<p class=\"lead\"><em>Numerous Constraints Limit the Availability of Developable Land<\/em><\/p>\n<p>In my last post, I showed how new development can help us meet our environmental sustainability goals, including the county\u2019s commitment to <a href=\"https:\/\/www.montgomerycountymd.gov\/COUNCIL\/Resources\/Files\/res\/2017\/20171205_18-974.pdf\">eliminate greenhouse gas emissions entirely by 2035<\/a> and reduce stormwater runoff into the Chesapeake Bay.<\/p>\n<p>I also have discussed (<a href=\"https:\/\/montgomeryplanning.org\/blog-design\/2018\/07\/housing-preferences-and-affordability\/\" alt=\"Housing Preferences and Affordability\">here<\/a>, <a href=\"https:\/\/montgomeryplanning.org\/blog-design\/2018\/09\/new-suburbanisms-connection-to-economic-competitiveness\/\" alt=\"New Suburbanism: Not Just for Millennials\">here<\/a> and <a href=\"https:\/\/montgomeryplanning.org\/blog-design\/2018\/11\/new-suburbanisms-connection-to-economic-competitiveness-part-2\/\" alt-\"New Suburbanism: Walkability &#038; Transit\">here<\/a>) the ways in which New Suburbanism adds needed housing while satisfying consumer demand for walkable urban places, even in areas that aren\u2019t transit-oriented or adjacent to existing urban centers like Silver Spring and Bethesda.<\/p>\n<p>Now I want to direct your attention to a related problem: While we know that we need to add more than 20,000 housing units over the next five years to accommodate additional job growth, we don\u2019t have much undeveloped land that is suitable for new residential construction.<\/p>\n<p>A few years ago, the Planning Department conducted an exhaustive review of the county\u2019s land area by parcel and identified the constraints that restrict development. The results of this analysis illustrate that in a county with about 1 million people and a mature land use pattern, relatively few properties are entirely unconstrained by legal, physical or economic barriers to development.<\/p>\n<p>In turn, these limitations make it difficult to accommodate our growing population, contribute to high housing costs and risk pushing development farther from job and activity centers, exacerbating traffic and environmental problems.<\/p>\n<p>Montgomery County is more than 500 square miles in size or about 324,000 acres. At 93,000 acres, our <a href=\"http:\/\/montgomeryplanning.org\/awards\/ag-reserve-award\/\">award-winning Agricultural Reserve<\/a>, where development rights are extremely limited, comprises almost a third of that land area, constraining new building even more.<\/p>\n<h4>Montgomery County Agricultural Reserve<\/h4>\n<img decoding=\"async\" class=\"alignnone wp-image-5694\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Ag-ReserveMap.jpg\" alt=\"Agricultural Reserve Map\" width=\"800\" height=\"697\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Ag-ReserveMap.jpg 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Ag-ReserveMap-300x261.jpg 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Ag-ReserveMap-768x669.jpg 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Ag-ReserveMap-1024x892.jpg 1024w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\n<p>Sensitive natural environments, requiring conservation and protections, also limit development. They include wetlands, stream buffers, forest conservation easements and, of course, parks. Including the Agricultural Reserve, the total area affected by these environmental restrictions is almost 250,000 acres \u2013 leaving only about 75,000 acres.<\/p>\n<h4>Environmental Constraints Composite<\/h4>\n<img decoding=\"async\" class=\"alignnone wp-image-5691\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvironmentalConstraintsComposite_1.jpg\" alt=\"\" width=\"800\" height=\"554\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvironmentalConstraintsComposite_1.jpg 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvironmentalConstraintsComposite_1-300x208.jpg 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvironmentalConstraintsComposite_1-768x532.jpg 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvironmentalConstraintsComposite_1-1024x709.jpg 1024w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\n<p>Much of the county\u2019s land area is also subject to man-made constraints imposed by both public and private entities. In the series of images below, man-made constraints are represented in gray and red.<\/p>\n<h4>Man-made Constraints by Type<\/h4>\n<div id=\"metaslider-id-5636\" style=\"width: 100%;\" class=\"ml-slider-3-108-0 ml-slider-pro-2-56-0 metaslider metaslider-flex metaslider-5636 ml-slider has-dots-nav ms-theme-_theme_1601499156\" role=\"region\" aria-label=\"Constraint Maps\" data-height=\"900\" data-width=\"1200\">\n    <div id=\"metaslider_container_5636\">\n        <div id=\"metaslider_5636\">\n            <ul class='slides'>\n                <li style=\"display: block; width: 100%;\" class=\"slide-5706 ms-image \" aria-roledescription=\"slide\" data-date=\"2019-01-11 11:26:27\" data-filename=\"Constraints_UtilTransportationGov_2.png\" data-slide-type=\"image\"><img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_UtilTransportationGov_2.png\" class=\"slider-5636 slide-5706 msDefaultImage\" alt=\"Map of Montgomery County with Public Education contraints shaded red. Other man-made constraints shaded gray are: Utility Sites (WSSC and Transmission Lines), Transportation Infrastructure (Metro, Rail, State Roads and Federal Highways), Government Ownership and Rustic Roads. Area Constrained = 75,739 Acres (23%).\" rel=\"\" title=\"Man-Made Constraints: Utilities, Transportation, Government sites\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_UtilTransportationGov_2.png 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_UtilTransportationGov_2-300x225.png 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_UtilTransportationGov_2-768x576.png 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_UtilTransportationGov_2-1024x768.png 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/li>\n                <li style=\"display: none; width: 100%;\" class=\"slide-5704 ms-image \" aria-roledescription=\"slide\" data-date=\"2019-01-11 11:26:27\" data-filename=\"Constraints_HistPres_2.png\" data-slide-type=\"image\"><img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_HistPres_2.png\" class=\"slider-5636 slide-5704 msDefaultImage\" alt=\"Map of Montgomery County with Historic Preservation contraints shaded red; other man-made constraints shaded gray are: Utility Sites (WSSC and Transmission Lines), Transportation Infrastructure (Metro, Rail, State Roads and Federal Highways), Government Ownership, Rustic Roads and Public Education. Area Constrained = 98,787 Acres (30%).\" rel=\"\" title=\"Man-Made Constraints: Historic Preservation\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_HistPres_2.png 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_HistPres_2-300x225.png 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_HistPres_2-768x576.png 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_HistPres_2-1024x768.png 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/li>\n                <li style=\"display: none; width: 100%;\" class=\"slide-5705 ms-image \" aria-roledescription=\"slide\" data-date=\"2019-01-11 11:26:27\" data-filename=\"Constraints_TDRQuarHousing_2.jpg\" data-slide-type=\"image\"><img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_TDRQuarHousing_2.jpg\" class=\"slider-5636 slide-5705 msDefaultImage\" alt=\"Map of Montgomery County with the following man-made contraints shaded red: Exhausted TDR\u2019s, Rock Quarries, Regulated Affordable Housing, Private Institutional, Common HOA Ownerships. Man-made constraints shaded gray are: Utility Sites (WSSC and Transmission Lines), Transportation Infrastructure (Metro, Rail, State Roads and Federal Highways), Government Ownership, Rustic Roads, Public Education and Historic Preservation. Area Constrained = 111,049 Acres (34%).\" rel=\"\" title=\"Man-made Constraints: TDR\u2019s, Quarries, Affordable Housing, HOA\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_TDRQuarHousing_2.jpg 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_TDRQuarHousing_2-300x225.jpg 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_TDRQuarHousing_2-768x576.jpg 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/Constraints_TDRQuarHousing_2-1024x768.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/li>\n                <li style=\"display: none; width: 100%;\" class=\"slide-5707 ms-image \" aria-roledescription=\"slide\" data-date=\"2019-01-11 11:26:27\" data-filename=\"ManmadeComp_2.jpg\" data-slide-type=\"image\"><img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/ManmadeComp_2.jpg\" class=\"slider-5636 slide-5707 msDefaultImage\" alt=\"Map of Montgomery County with the following man-made contraints shaded gray: Utility Sites (WSSC and Transmission Lines), Transportation Infrastructure (Metro, Rail, State Roads and Federal Highways), Government Ownership, Rustic Roads, Public Education and Historic Preservation, Exhausted TDR\u2019s, Rock Quarries, Regulated Affordable Housing, Private Institutional, Common HOA Ownerships and Single Family Dwellings. Area Constrained = 201,154 Acres (62%).\" rel=\"\" title=\"Man-made constraints composite\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/ManmadeComp_2.jpg 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/ManmadeComp_2-300x225.jpg 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/ManmadeComp_2-768x576.jpg 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/ManmadeComp_2-1024x768.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/li>\n            <\/ul>\n        <\/div>\n        \n    <\/div>\n<\/div>\n<p>In the first image in the series above, we see that utilities and transportation infrastructure, including power lines, roads, Metrorail and railroad lines, take up about 14,000 acres. Another 60,000 acres are owned by the government, including sites for government offices and warehouses as well as public schools and parkland (public school sites are in red).<\/p>\n<p>The second image shows that another 20,000 acres are protected by historic preservation designation (in red), bringing the total area subject to these man-made constraints to almost 99,000 acres. As with government-owned property, some of this area is parkland and is therefore also counted as an environmental constraint.<\/p>\n<p>Moving to the next image, roughly another 6,000 acres consists of played-out rock quarries and transferable development rights that limit development in agricultural zones. Regulated affordable housing (which unlike market-rate affordable housing is unlikely to be redeveloped), private institutional uses (like schools and religious institutions) and property under common homeowner association (HOA) ownership add up to about another 6,000 acres (these categories are all in red on the map).<\/p>\n<p>At this point, the total acreage of land under one form or another of regulatory or physical constraint totals about 111,000 acres or more than a third of the county\u2019s total area.<\/p>\n<p>Another 90,000 acres in Montgomery County are zoned for single-family housing. Some minor intensification can occur in these neighborhoods \u2013 primarily in the form of townhomes. But absent regulatory changes that make it easier to build townhomes, duplexes and small apartment buildings, most of these neighborhoods will never see much additional housing.<\/p>\n<p>The fourth and final image in the series above demonstrates that with the inclusion of single-family zoned neighborhoods, the total land area under a man-made development constraint comes to 201,000 acres, or 62 percent of the county\u2019s total land mass.<\/p>\n<p>As I pointed out earlier, environmental and man-made constraints do overlap somewhat \u2013 for example, parks can be considered both an environmental and a man-made constraint on development. Another example of this overlap can be seen in single-family housing and roads in the Agricultural Reserve. However, once we account for these areas of overlap, our research shows that 81 percent of the county is under a constraint, leaving only 62,000 acres \u2013 or 19 percent of the county \u2013 available for development.<\/p>\n<h4>Environmental and man-made constraints<\/h4>\n<img decoding=\"async\" class=\"alignnone wp-image-5690\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvManmade_1.jpg\" alt=\"\" width=\"800\" height=\"523\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvManmade_1.jpg 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvManmade_1-300x196.jpg 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvManmade_1-768x502.jpg 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/EnvManmade_1-1024x669.jpg 1024w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\n<p>But even the 62,000 acres left over aren\u2019t necessarily likely candidates for development, because other considerations influence whether a particular property will be redeveloped. The Planning Department\u2019s research staff identified several factors that act as economic or practical barriers to the development of a parcel that is otherwise unconstrained by environmental or legal factors. Our staff found that redevelopment in the near to medium term is unlikely where:<\/p>\n<ul>\n<li>The value of existing improvements is at least twice the value of land.<\/li>\n<li>An office building on the site is less than 50 years old.<\/li>\n<li>An existing retail building is less than 15 years old.<\/li>\n<li>A parcel is owned by multiple parties.<\/li>\n<\/ul>\n<p>This analysis is somewhat oversimplified and is not meant to predict with certainty whether any particular parcel will be redeveloped, but it provides a useful filter for understanding how much land that might be available could plausibly be expected to support new development activity.<\/p>\n<p>If any of the first three factors are present, the expected rate of return is unlikely to be high enough to offset the cost and risk of redevelopment or, in many cases, even allow the developer to obtain financing. With the last factor, the practical difficulties of getting multiple property owners \u2013 some of whom may rely on a steady cash flow from an investment property \u2013 to take on the financial risks of redevelopment are often impossible to overcome (as the county\u2019s experience with the Glenmont shopping center has shown).<\/p>\n<p>Once these additional qualifiers are added to the analysis, only about 15 percent of the county\u2019s land is available for development.<\/p>\n<h4>Environmental and man-made constraints and Qualifiers<\/h4>\n<img decoding=\"async\" class=\"alignnone wp-image-5693\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/CompositeQual_1.jpg\" alt=\"\" width=\"800\" height=\"531\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/CompositeQual_1.jpg 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/CompositeQual_1-300x199.jpg 300w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/CompositeQual_1-768x510.jpg 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/CompositeQual_1-1024x680.jpg 1024w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\n<p>Of course, 48,000 acres is a lot of land, but much of this acreage is not necessarily optimal for redevelopment. For environmental, economic and social reasons, Montgomery County\u2019s \u201cWedges and Corridors\u201d General Plan, adopted in 1969 and still guiding our land use planning, prioritizes development in the urban ring and along our major transportation corridors. The location of the remaining 15 percent of the county\u2019s developable land isn\u2019t concentrated in any one area and certainly not in our urban centers.<\/p>\n<p>Take a look at this more tightly focused constraints analysis, showing developable parcels within \u00bd and \u00bc mile of each of the county\u2019s 13 Metrorail stations.<\/p>\n<h4>Metrorail Constraints<\/h4>\n<img decoding=\"async\" class=\"alignnone wp-image-5688\" src=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/METRO_SUITABILITY_web.jpg\" alt=\"\" width=\"800\" height=\"1200\" srcset=\"https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/METRO_SUITABILITY_web.jpg 1200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/METRO_SUITABILITY_web-200x300.jpg 200w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/METRO_SUITABILITY_web-768x1152.jpg 768w, https:\/\/montgomeryplanning.org\/blog-design\/wp-content\/uploads\/2019\/01\/METRO_SUITABILITY_web-683x1024.jpg 683w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\n<p>This analysis shows that a little more than 700 acres of land might reasonably be expected to be available for redevelopment within \u00bd acre of a Metro station in Montgomery County and less than half that amount within \u00bc mile of a Metro station.<\/p>\n<p>Yet, if you look at the map of average vehicle miles traveled per household included in my last post, you\u2019ll see that there are compelling reasons to focus new housing and office development in transit-accessible areas. Given concerns about traffic and carbon emissions, we should make it possible for many more people to live and work near transit.<\/p>\n<p>Maximizing the development potential near transit is only one half of the equation: even accounting for increased heights and densities permitted in plans like the recent one for downtown Bethesda, 700 or so acres of land within \u00bd mile of a Metro station do not provide enough capacity to accommodate the increasing demand for housing in Montgomery County.<\/p>\n<p>To ensure that growth occurs close to job centers and other amenities, and demand for walkable, mixed-use communities is satisfied, we also need to take advantage of redevelopment opportunities that transform aging, low-density, surface-parked properties in desirable locations into communities like Pike &amp; Rose, Park Potomac and Chevy Chase Lake (now under construction).<\/p>\n<p>This two-pronged strategy \u2013 concentrating infill redevelopment near transit areas and in strategically located mixed-use redevelopment projects \u2013 is the only way we can continue to protect the Agricultural Reserve and prevent sprawl while accommodating the county\u2019s growing population. Infill redevelopment helps us meet our housing needs so we can avoid exacerbating high housing costs and pushing lower and middle-income residents farther from jobs and amenities or out of Montgomery County altogether. If we can\u2019t find a way to make room for all our residents \u2013 current and future taxpayers and neighbors \u2013 we risk sacrificing our county\u2019s diversity, character, environmental sustainability and economic vitality.<\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"lead\"><em>Numerous Constraints Limit the Availability of Developable Land<\/em><\/p>\n<p>In my last post, I showed how new development can help us meet our environmental sustainability goals, including the county\u2019s commitment to eliminate greenhouse gas emissions entirely by 2035 and reduce stormwater runoff into the Chesapeake Bay.<\/p>\n<p>I also have discussed (here, here and here) the ways in which New Suburbanism adds needed housing while satisfying consumer demand for walkable urban places, even in areas that aren\u2019t transit-oriented or adjacent to existing urban centers like Silver Spring and Bethesda.<\/p>\n<p>Now I want to direct your attention to a related problem: While we know that we need to add more than 20,000 housing units over the next five years to accommodate additional &#8230; <a href=\"https:\/\/montgomeryplanning.org\/blog-design\/2019\/01\/man-made-and-environmental-constraints-on-development-in-montgomery-county\/\" class=\"read-more\">Continue reading<\/a><\/p>\n","protected":false},"author":31,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[5,519],"tags":[],"class_list":["post-5633","post","type-post","status-publish","format-standard","hentry","category-planning","category-research"],"_links":{"self":[{"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/posts\/5633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/comments?post=5633"}],"version-history":[{"count":18,"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/posts\/5633\/revisions"}],"predecessor-version":[{"id":5723,"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/posts\/5633\/revisions\/5723"}],"wp:attachment":[{"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/media?parent=5633"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/categories?post=5633"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montgomeryplanning.org\/blog-design\/wp-json\/wp\/v2\/tags?post=5633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}