Purple Line Mandatory Referral Submissions
Appendix A: Submission Overview
Appendix B: Preliminary Engineering Drawings
Appendix C: Environmental Documentation
Appendix D: Traffic Documentation
Appendix E: Pedestrian and Bicycle Documentation
Appendix F: Historic Preservation Documentation
Appendix G: Bethesda South Entrance Project
Appendix H: Other
Appendix A: Submission Overview
Appendix B: Preliminary Engineering Drawings
- Index of Drawings
- Volume 1: Track, Highway, Trail Alignment, and Survey
- Volume 2: Track, Highway, Trail Cross Sections
- Volume 3: Maintenance of Traffic & Traffic Signals
- Volume 4: Right of Way, Drainage, and Stormwater
- Volume 5: Utility Relocations
- Volume 6: Structures
- Volume 7: Stations and Civil Plans
- Volume 8: Yard and Shop
- Volume 9: Systems
Appendix C: Environmental Documentation
- Natural Resource Mapping
- Water Quality Maps
- Water Resources from Tech Report
- Noise Ordinance Compliance from Tech Report
Appendix D: Traffic Documentation
- Traffic Signal Improvements from Basis of Design Report (BODR)
- MCDOT Design Exceptions Meeting Notes (11/20/2013)
- MCDOT Design Exceptions Meeting Notes (11/13/2013)
- MCDOT Memo Design Regarding Wayne Avenue Design Exceptions (8/6/2013)
- MTA Design Exception Request on Wayne Avenue (7/23/2013)
- Roadway Typ Section Basis of Design Report (BODR)
- Traffic Impacts from Analysis Tech Report
- Traffic Impacts from Final Environmental Impact Statement (FEIS)
- Traffic Impacts from Forecast Tech Report
Appendix E: Pedestrian and Bicycle Documentation
- Pedestrian/Bicycle Impact Statement Final Environmental Impact Statement (FEIS)
- Pedestrian/Bicycle Impacts Tech Report
Appendix F: Historic Preservation Documentation
Appendix G: Bethesda South Entrance Project
- Bethesda South Entrance Basis of Design Report (BODR)
- Bethesda South Entrance Concept Preliminary Engineering Submittal
Appendix H: Other
- Hours of Operation from Final Environmental Impact Statement (FEIS)
- Master Sector Plans from Tech Report
- Phasing - Schedule Construction from Final Environmental Impact Statement (FEIS)
- Land Use Planning from Tech Report
- Purple Line Presolicitation Report (8/5/2013)
- Parkland-MNCPPC Impacts from Final Environmental Impact Statement (FEIS)
- LEED Lyttonsville from Basis of Design Report (BODR)
M-NCPPC Staff Contact
David Anspacher, Functional Planning and Policy
301-495-2191
david.anspacher@montgomeryplanning.org
Tom Autrey, Functional Planning and Policy
301-495-4533
thomas.autrey@montgomeryplanning.org
Last updated: Feb. 20, 2014